The 1.8 km long Nordpark Cable Railway, comprised of four new stations and a cable-stayed suspension bridge over the river Inn, takes you from the center of Innsbruck to the top of the mountain in less than half an hour.

The design for each station adapts to the specific site conditions at various altitudes, whilst maintaining the coherent overall architectural language of fluidity. This approach was critical to the design for the railway, and demonstrates the seamless morphology of Hadid’s most recent architecture.

The railway reflects the city’s continued commitment to the highest standards of architecture and pushes the boundaries of design and construction technology. These stations are the global benchmark for the use of double-curvature glass in construction.
/Zaha Hadid
3_nordpark.jpg

Photo: Thomas Mayer Congress Station

4_nordpark.jpg

Photo: Thomas Mayer Congress Station

5_nordpark.jpg

Photo: Thomas Mayer Loewenhaus Station

6_nordpark.jpg

Photo: Thomas Mayer Loewenhaus Station

7_nordpark.jpg

Photo: Thomas Mayer Loewenhaus Station

8_nordpark.jpg

Photo: Thomas Mayer

9_nordpark.jpg

Photo: Thomas Mayer

10_nordpark.jpg

Photo: Thomas Mayer Alpenzoo Station

11_nordpark.jpg

Photo: Thomas Mayer Alpenzoo Station

12_nordpark.jpg

Photo: Thomas Mayer Alpenzoo Station

Starting at the underground Congress Station in the center of the city, the railway travels through a tunnel to Loewenhaus Station by by the river.

After crossing the river Inn on Hadid’s suspension bridge, held by steel cables from concrete pylons, the car starts its steep ascend on the Nordkette Mountain side to Alpenzoo Station.

The final station is at Hungerburg village, 288 meters above Innsbruck, where passengers can join the cable-car to the summit of the Seegrube Mountain.

13_nordpark.jpg

Photo: Thomas Mayer Hungerburg Station

14_nordpark.jpg

Photo: Thomas Mayer Hungerburg Station

15_nordpark.jpg

Photo: Thomas Mayer Hungerburg Station

 

Each station has its own unique context, topography, altitude, and circulation. We studied natural phenomena such as glacial moraines and ice movements – as we wanted each station to use the fluid language of natural ice formations, like a frozen stream on the mountainside.
/Zaha Hadid
16_nordpark.jpg

Rendering courtesy Zaha Hadid Architects Congress Station

17_nordpark.jpg

Rendering courtesy Zaha Hadid Architects Loewenhaus Station

18_nordpark.jpg

Rendering courtesy Zaha Hadid Architects Alpenzoo Station

19_nordpark.jpg

Rendering courtesy Zaha Hadid Architects Hungerburg Station

20_nordpark.jpg

Drawing courtesy Zaha Hadid Architects Site Plan

21_nordpark.jpg

Drawing courtesy Zaha Hadid Architects Street Level Plan Congress Station

22_nordpark.jpg

Drawing courtesy Zaha Hadid Architects Platform Level Plan Congress Station

23_nordpark.jpg

Drawing courtesy Zaha Hadid Architects Longitudinal Section Congress Station

24_nordpark.jpg

Drawing courtesy Zaha Hadid Architects Plan Lowenhaus Station

25_nordpark.jpg

Drawing courtesy Zaha Hadid Architects Longitudinal Section Loewenhaus Station

26_nordpark.jpg

Drawing courtesy Zaha Hadid Architects Plan Alpenzoo Station

27_nordpark.jpg

Drawing courtesy Zaha Hadid Architects Longitudinal Section Alpenzoo Station

28_nordpark.jpg

Drawing courtesy Zaha Hadid Architects Plan Hungerburg Station

29_nordpark.jpg

Drawing courtesy Zaha Hadid Architects Longitudinal Section Hungerburg Station The railway opened on December 1, 2007.

A high degree of flexibility within this language enables the shell structures to adjust to these various parameters whilst maintaining a coherent formal logic. Two contrasting elements “Shell & Shadow” generate each station’s spatial quality, with lightweight organic roof structures of double-curvature glass “floating” on top of concrete plinths, creating an artificial landscape that describes the movement and circulation within.

New production methods such as CNC milling and thermoforming guaranteed a very precise and automatic translation of the computer generated design into the built structure. The architects used state-of-the-art design and manufacturing technologies developed for the automotive industry to create the streamlined aesthetics of each station.

Nordpark Cable Railway continues Hadid’s quest for an architecture of seamless fluidity, representing Zaha Hadid Architects’ very latest contribution to the current global architectural discourse in digital design and construction.

It is the second project completed by Zaha Hadid in the city; the Bergisel Ski Jump by Hadid was completed in 2002 and awarded the Gold Medal for Design by the International Olympic Committee in 2005.

INFORMATION

CITYInnsbruck
COUNTRYAustria
CONSTRUCTION YEAR2007
ARCHITECTThomas Vietzke

CLIENT

CONTRACTOR